Hijri ANCPregnancy due date
Hijri ANC app icon
Hijri ANCVersion 2.0.1

One pregnancy.
Two calendars.
Zero guesswork.

A focused antenatal calculator for clinicians who work across Gregorian and Umm al‑Qura Hijri dates—with trusted obstetric formulas and private on-device processing.

Download on the App Store Get it on Google Play
4Dating methods
Hijri + GregorianShown together
On devicePrivate processing
Hijri ANC pregnancy dating result running on iPhone Simulator
DUAL CALENDAR15 Safar 1448 AH29 July 2026

Fresh iPhone Simulator capture

Umm al‑Qura calendarACOG-based formulasNo account requiredNo advertisingNo tracking SDKs

Start with the date you trust.

Choose the method that matches the clinical information available. Hijri ANC returns gestational age, expected delivery date, and antenatal milestones in both calendar systems.

01

Last menstrual period

Standard LMP dating with gestational age, EDD, and antenatal milestones.

02

Ultrasound / EDD

Use a known due date or scan date with ultrasound gestational age.

03

Conception / IUI

Calculate from conception or insemination when LMP is not the right basis.

04

IVF transfer

Dedicated Day-3 and Day-5 embryo transfer dating.

Read the same clinical date in the calendar your patient uses.

Every core dating result keeps Hijri and Gregorian dates together, supported by the official Umm al‑Qura calendar model.

  • Gestational age today
  • Expected delivery date
  • LMP and conception dates
  • Antenatal milestone schedule
Hijri ANC antenatal milestone schedule showing Gregorian and Hijri dates together
Actual app screenEvery milestone carries both calendar dates.Real Hijri ANC antenatal schedule

Focused extras for everyday antenatal work.

Hijri ANC remains intentionally compact while covering the score and conversion tools most often needed beside pregnancy dating.

Body Mass Index

WHO adult category with a clear colour gauge.

Bishop Score

Cervical favourability assessment with guided criteria.

Apgar Score

Structured 1- and 5-minute neonatal assessment.

Date Converter

Two-way Hijri and Gregorian date conversion.

Hijri ANC icon

Your calculation inputs stay on your device.

Hijri ANC does not require an account and does not collect, transmit, sell, or share personal data. There are no advertising, analytics, or tracking SDKs.

No sign-inNo cloud storageNo adsNo tracking
Read the full privacy policy →

A focused support tool—not a substitute for clinical judgment.

Hijri ANC is designed for healthcare professionals and educational support. Verify results, assess the patient directly, and follow current institutional protocols and local clinical guidance.

Meet the Hijri ANC team →

Make dual-calendar pregnancy dating part of your everyday workflow.

Hijri ANC is available on the App Store and Google Play.

Download on the App StoreGet it on Google Play
Need the complete suite? Explore ObiCalc →
Hijri ANC app icon